TEAM OPERATIONS · PLAN, COMPARE, EXPORT

Course Curriculum Planner

Build a sequenced curriculum with prerequisite validation, study hours and capacity-based study-day assignments.

Local calculationsEditable projectsCSV & reports
  1. 1Explore the example
  2. 2Edit your assumptions
  3. 3Compare & export

Loading the worked example…

Your working data

Edit cells directly or import a CSV. Download “Input CSV” for the required column names. Up to 200 rows; scroll the table sideways for additional fields.

What this model includes

Prerequisites form a directed graph. Sequence is topological, one learner at a time; study days are sequential numbers, not calendar dates.

Import and save safely

CSV imports use your current assumptions. Project files restore assumptions, rows and saved scenarios. No automatic saving: download a project before closing this page. Imports are limited to 10 MiB and 200 rows. Calculations run in your browser; the site’s advertising and analytics follow its privacy policy.

Using Course Curriculum Planner

Build a sequenced curriculum with prerequisite validation, study hours and capacity-based study-day assignments.

  1. Review the preloaded example and the model limits before entering real data.
  2. Adjust study hours per day.
  3. Edit the module id rows or import a CSV using the Input CSV column template.
  4. Open Results & chart to inspect details, sort columns and filter rows.
  5. Capture alternative scenarios, then download a project, result CSV or printable report.

Example

The worked example includes M1, M2, M3.
Change the first study hours per day setting and compare the result with a saved baseline.

Questions & answers

What does Course Curriculum Planner calculate?

Build a sequenced curriculum with prerequisite validation, study hours and capacity-based study-day assignments.

What are the important limitations?

Prerequisites form a directed graph. Sequence is topological, one learner at a time; study days are sequential numbers, not calendar dates.

Can I continue my work later?

Yes. Save a project JSON file and reopen it with Import CSV / project. It contains the working data, assumptions and up to four scenarios. Nothing is saved automatically.

What CSV columns do I need?

id, title, requires, lesson, practice, assessment. Download Input CSV for a compatible example. CSV imports keep your current assumptions.

Are these example figures current industry benchmarks?

No. They are illustrative values to demonstrate the model. Replace them with figures appropriate to your situation.

Help improve this tool

Report a problem or suggest an improvement

Describe the issue without pasting private tool input. Feedback goes to our admin inbox.

Find another tool · Read practical guides