COLLECTORS & HOBBYISTS · PLAN, COMPARE, EXPORT

Stamp Set Completion Tracker

Track a manually defined stamp checklist, missing entries and duplicate copies available for exchange.

Local calculationsEditable projectsCSV & reports
  1. 1Explore the example
  2. 2Edit your assumptions
  3. 3Compare & export

Loading the worked example…

Your working data

Edit cells directly or import a CSV. Download “Input CSV” for the required column names. Up to 200 rows; scroll the table sideways for additional fields.

What this model includes

Completion refers only to the checklist you enter. Catalog IDs, authenticity, condition and estimated prices are not verified.

Import and save safely

CSV imports use your current assumptions. Project files restore assumptions, rows and saved scenarios. No automatic saving: download a project before closing this page. Imports are limited to 10 MiB and 200 rows. Calculations run in your browser; the site’s advertising and analytics follow its privacy policy.

Using Stamp Set Completion Tracker

Track a manually defined stamp checklist, missing entries and duplicate copies available for exchange.

  1. Review the preloaded example and the model limits before entering real data.
  2. Adjust acquisition budget.
  3. Edit the set / series rows or import a CSV using the Input CSV column template.
  4. Open Results & chart to inspect details, sort columns and filter rows.
  5. Capture alternative scenarios, then download a project, result CSV or printable report.

Example

The worked example includes Birds, Birds, Flowers.
Change the first acquisition budget setting and compare the result with a saved baseline.

Questions & answers

What does Stamp Set Completion Tracker calculate?

Track a manually defined stamp checklist, missing entries and duplicate copies available for exchange.

What are the important limitations?

Completion refers only to the checklist you enter. Catalog IDs, authenticity, condition and estimated prices are not verified.

Can I continue my work later?

Yes. Save a project JSON file and reopen it with Import CSV / project. It contains the working data, assumptions and up to four scenarios. Nothing is saved automatically.

What CSV columns do I need?

set, catalog, description, wanted, owned, cost. Download Input CSV for a compatible example. CSV imports keep your current assumptions.

Are these example figures current industry benchmarks?

No. They are illustrative values to demonstrate the model. Replace them with figures appropriate to your situation.

Help improve this tool

Report a problem or suggest an improvement

Describe the issue without pasting private tool input. Feedback goes to our admin inbox.

Find another tool · Read practical guides